Community
City of Fall River to begin second round of 2019 water system flushing program
It is about that time for the City of Fall River’s semi-annual water system flushing program.
The program is set to begin on October 7th, 2019 from 8:00 a.m. to 3:30 p.m. and ending November 15th, 2019.
Residents may experience some temporary discoloration of their water during flushing operations.
As a precaution, residents are asked to check their water before washing laundry.
The Water Division apologizes for any inconvenience this may cause; however, they state that this is a vital part of the annual water distribution system maintenance program.
You must be logged in to post a comment Login