Connect with us

Community

Maintenance work taking place on the Braga Bridge in Fall River, Somerset, expected to impact traffic

Published

on

FALL RIVER/SOMERSET – The Massachusetts Department of Transportation is announcing it will be conducting maintenance work on the Braga Bridge carrying I-195 over the Taunton River in Fall River and Somerset. Work is expected to begin at 9:00 a.m. on Monday, October 17, and is expected to be completed by 3:00 p.m.

The right lane on I-195 eastbound the entire length of the bridge will be temporarily closed during the maintenance operations. Two travel lanes will remain open in the eastbound direction at all times while the maintenance is being performed.

Drivers who are traveling through the affected areas should expect delays, reduce speed, and use caution. All scheduled work is weather dependent and/or may be impacted due to an emergency situation.

Advertisement
1 Comment

1 Comment

  1. Fed Up

    October 16, 2022 at 6:14 pm

    They’ve been working on this longer than it took to construct the damn thing.

You must be logged in to post a comment Login

Leave a Reply

Trending

Copyright © 2017 Fall River Reporter

Translate »