Connect with us

Community

City of Fall River to begin second round of 2021 water system flushing program

Published

on

It is about that time for the City of Fall River’s semi-annual water system flushing program.

The program is set to begin on October 4th, 2019 from 8:00 a.m. to 3:30 p.m. and ending November 19th, 2019.

Residents may experience some temporary discoloration of their water during flushing operations.

As a precaution, residents are asked to check their water before washing laundry.

The Water Division apologizes for any inconvenience this may cause; however, they state that this is a vital part of the annual water distribution system maintenance program.

If you have any questions, contact the Department at 508-324-2721.

Advertisement
Click to comment

You must be logged in to post a comment Login

Leave a Reply

Trending

Copyright © 2017 Fall River Reporter

Translate »